GRS Roadstone required replacement and new fuel infrastructure across a nationwide operation. The programme combined large and smaller bunded tanks with managed dispensing, tank monitoring and secure identification technology.
Sector context image
Project approach
From operational problem to working system.
GRS Roadstone’s programme combined thirteen bunded tanks, twelve FT4000 systems and eight TankWatch systems across new and existing locations.
Deliver a large multi-site programme while limiting operational impact
- Several sites required new 30,000-litre tanks while other locations needed smaller replacement tanks.
- Installations had to be planned around an active national construction-materials operation.
- The business wanted safeguards, monitoring and secure access included across the programme rather than added later.
Deploy a consistent Fueltek technology stack across the network
- Supplied eight 30,000-litre bunded tanks and five 25,000-litre bunded diesel tanks.
- Installed 12 FT4000 fuel management systems connected to Fueltek FMO.
- Added eight TankWatch systems together with Datatag and DataNozzle access technology.
Project in context
The brief, explained in more detail.
The project brought together the equipment and operating processes described below. Explore how the installation worked and the considerations for a similar system at your site.
A coordinated equipment programme across the network.
GRS Roadstone required new and replacement fuel infrastructure across its nationwide construction-materials operation. Some locations needed new 30,000-litre tanks, while others required smaller replacements. Installation work had to fit around sites that remained part of an active operating network.
Fueltek supplied eight 30,000-litre bunded tanks and five 25,000-litre bunded diesel tanks. The programme also included twelve FT4000 management systems connected to FMO, eight TankWatch systems, and Datatag and DataNozzle access technology.
The project brought replacement storage, managed dispensing and monitoring into one coordinated programme across new and existing locations. The tank, control-unit and monitoring quantities describe different parts of that installation, with equipment selected around the network’s requirements.
System architecture
How the Fueltek layers worked together.
A fuel-management project normally has several distinct jobs to do: physically store or dispense product, decide who is allowed to use it, measure what is held in storage, and turn activity into information that managers can review. The cards below show the roles of the systems connected with this case study.

Bulk storage selected around the site requirement
The tank is the physical starting point of an onsite fuel system. Capacity, product type, compartment arrangement and installation layout should be selected around delivery frequency, peak demand, vehicle movements and the space available. In Fueltek case-study projects the storage element is often designed together with dispensing and monitoring so that the tank is not treated as a separate asset with no connection to the management system.
Explore Fuel storage tanks →
Authorised dispensing and transaction control
The FT4000 is the control layer at the fuelling point. It can be used to authorise dispensing, associate a transaction with an approved user or vehicle and create a structured transaction record instead of leaving the pump as an isolated piece of equipment. Where the project configuration captures additional fields such as mileage or identification data, those details can sit alongside the quantity dispensed so later reporting has operational context.
Explore FT4000 →
Independent tank-level and stock monitoring
TankWatch measures what is physically held in the storage tank using tank probes and a local control layer. That gives the operator information such as current stock, available capacity, deliveries, stock movements and throughputs. It complements pump transaction data because it answers a different question: the pump records what the system says was dispensed, while tank monitoring measures what is actually happening in storage.
Explore TankWatch →Operational workflow
From fuel on site to usable information.
The steps below explain the roles of the technologies discussed in this project. The exact operating sequence depends on the equipment and identification process specified for the installation.
Store & receive
Bulk product is received into the site storage arrangement. Tank capacity, product compatibility and delivery access are part of the physical specification before the management system can add useful control.
Authorise
The managed dispensing layer checks that the user or vehicle is permitted to draw fuel before the transaction proceeds. The exact identification method depends on the project configuration.
Dispense & record
Fuel is dispensed through the managed pump or controller. The quantity dispensed becomes a transaction record rather than remaining only as a mechanical pump total.
Measure stock independently
TankWatch measures the physical tank level. This gives the operator a second information source for stock, deliveries and movements alongside the pump transaction record.
Planning a similar project
What should be defined before specification.
The case-study equipment should not be copied blindly. A new installation needs to be sized and configured around the actual operation. These are the main questions We need to understand before choosing the appropriate hardware and software.
Fuel & storage
Which products are stored? What is the expected daily usage, peak usage, delivery frequency and reserve requirement? These answers influence tank capacity and whether multiple compartments are appropriate.
Vehicles & dispensing
Vehicle type, fill-point position, desired flow rate, hose reach and simultaneous fuelling demand determine the practical pump, hose and nozzle arrangement.
Access & accountability
Define whether authorisation should be tied to a driver, vehicle, department, contractor or another operational identity, and what information needs to be captured with each transaction.
Tank visibility
Decide what the site needs to know about physical stock: current level, ullage, deliveries, movement, alarms and how that information should be reconciled with pump transactions.
Reporting & users
Identify who needs reports, whether the organisation is single-site or multi-site, which managers need local or central access and what exceptions should be easy to investigate.
Installation & handover
Existing equipment, electrical and data connections, vehicle movements, groundwork, commissioning windows, staff training and any fixed go-live date all affect the delivery plan.
Apply the learning
What to take into your own project.
For a similar programme, keep a separate schedule of sites, tanks, control units and monitoring equipment. Those counts describe different parts of the installation and should not be used interchangeably when defining scope or comparing proposals.
Read the project outcome →Case-study FAQ
Project detail and specification questions.
These answers separate the recorded facts of this case study from the decisions that would need to be made for a new installation.
What was the main issue this construction & distribution project needed to solve?
Deliver a large multi-site programme while limiting operational impact. Several sites required new 30,000-litre tanks while other locations needed smaller replacement tanks. Installations had to be planned around an active national construction-materials operation.
Which Fueltek systems are connected with this case study?
This project brought together Fuel storage tanks, FT4000 and TankWatch. Each system has a distinct role in fuel control, storage, monitoring or reporting.
Why use both pump records and tank monitoring where both are installed?
They measure different parts of the operation. Managed dispensing records the authorised transaction at the pump, while tank monitoring measures physical stock and movements in storage. Reviewing both gives the operator more context than either source on its own.
Would a new project use exactly the same specification?
Not automatically. A similar project should be specified around fuel type, storage capacity, peak dispensing demand, hose reach, user and vehicle access, communications, reporting requirements, installation constraints and any existing equipment that is suitable to retain.
What should be defined before a site survey or quotation?
Useful starting information includes the products to be stored, approximate daily and peak usage, current tank and pump details, vehicle types, required flow rate, number of users or vehicles, preferred access method, reporting expectations, communications available at the site and any installation or handover deadline.
Project outcome
What changed.
The programme replaced ageing storage and introduced managed dispensing and monitoring across both new and existing locations in the GRS network.
Relevant Fueltek systems
Explore the technology used.
Equipment is specified around the site, fuels, users, reporting requirements and existing infrastructure. The links below show the closest current Fueltek product areas connected with this project.
Plan your own system
Have a similar operational challenge?
Fueltek can review your tanks, pumps, vehicles, users, reporting requirements and existing equipment before recommending the most practical route forward.