Customer requirement
The customer wanted clearer fuel-use information and later needed to control water drawn by contractors.
Customer project archive
The Harry Potter World project began with fuel control and later extended to contractor water dispensing.

Accountability beyond the fuel point.
01
The customer wanted clearer fuel-use information and later needed to control water drawn by contractors.
02
The fuel installation combined FT4000AP dispensing, identification and TankWatch. A subsequent bespoke project introduced three water dispensing and monitoring units.
03
The water system recorded use and supported allocations and charges above an allowance. This was a project-specific application. The work connected controlled dispensing with a clearer record of contractor use.
Equipment and quantities shown relate to this customer’s installation at the time of the project.