Godolphin’s operation depends on fuel for transport, estate work and machinery. Existing equipment was not communicating reliably with reporting software, making reconciliation difficult across remote fuel locations.

Fuel management operations relevant to the Agriculture & estates sector Sector context image
5tank locations
2operating areas
FT4000 + TankWatch + FMOconnected management stack

Project approach

From operational problem to working system.

Five tank locations needed a dependable management and reporting approach around existing dispensing equipment.

The challenge

Improve communication and visibility across a dispersed estate

  • The previous system suffered reporting and communication failures.
  • Remote locations made it difficult to reconcile pump throughput with tank information.
  • The new management layer needed to work with suitable existing dispensing equipment.
The Fueltek solution

Add FT4000 control, TankWatch visibility and central FMO reporting

  • Introduced FT4000 management across five tank locations, mainly in Newmarket with an additional site in Gainsborough.
  • Integrated with suitable existing pumps rather than replacing equipment unnecessarily.
  • Added TankWatch and Fueltek FMO so transactions, stock information and management functions could be reviewed through one reporting environment.

Project in context

The brief, explained in more detail.

The project brought together the equipment and operating processes described below. Explore how the installation worked and the considerations for a similar system at your site.

Operational context

Connect the estate while retaining suitable pumps.

Godolphin’s fuel operation served transport, estate work and machinery across dispersed locations. Communication and reporting failures in the previous system made it difficult to reconcile pump throughput with tank information, particularly where fuel points were remote from day-to-day oversight.

Fueltek introduced FT4000 management across five tank locations, mainly in Newmarket with an additional site in Gainsborough. Suitable existing pumps were retained and interfaced with the new control equipment. TankWatch and FMO brought stock information, transactions and management functions into the connected reporting approach.

The project centred on improving the management layer around equipment that could still be used. It illustrates why a site review should distinguish the condition of the pump from the quality of its identification, communications and reporting. Replacing every physical component was not the approach described for this estate.

System architecture

How the Fueltek layers worked together.

A fuel-management project normally has several distinct jobs to do: physically store or dispense product, decide who is allowed to use it, measure what is held in storage, and turn activity into information that managers can review. The cards below show the roles of the systems connected with this case study.

FT4000
FT4000 fuel-control terminal
Product reference · project configuration may differ.

Authorised dispensing and transaction control

The FT4000 is the control layer at the fuelling point. It can be used to authorise dispensing, associate a transaction with an approved user or vehicle and create a structured transaction record instead of leaving the pump as an isolated piece of equipment. Where the project configuration captures additional fields such as mileage or identification data, those details can sit alongside the quantity dispensed so later reporting has operational context.

Explore FT4000 →
TankWatch
Tankwatch monitoring equipment
Product reference · project configuration may differ.

Independent tank-level and stock monitoring

TankWatch measures what is physically held in the storage tank using tank probes and a local control layer. That gives the operator information such as current stock, available capacity, deliveries, stock movements and throughputs. It complements pump transaction data because it answers a different question: the pump records what the system says was dispensed, while tank monitoring measures what is actually happening in storage.

Explore TankWatch →
FMO software
Fuel Manager Online dashboard reference
FMO screen reference · not this project’s records.

Browser-based reporting and multi-site visibility

Fueltek FMO provides the reporting and management layer above the field equipment. Depending on the installed configuration, authorised users can review fuel activity, run reports and manage information across users, vehicles, pumps or depots. On multi-site projects this is particularly important because it allows several physical locations to be viewed through one consistent reporting structure rather than as isolated fuel stations.

Explore FMO software →

Operational workflow

From fuel on site to usable information.

The steps below explain the roles of the technologies discussed in this project. The exact operating sequence depends on the equipment and identification process specified for the installation.

01

Store & receive

Bulk product is received into the site storage arrangement. Tank capacity, product compatibility and delivery access are part of the physical specification before the management system can add useful control.

02

Authorise

The managed dispensing layer checks that the user or vehicle is permitted to draw fuel before the transaction proceeds. The exact identification method depends on the project configuration.

03

Dispense & record

Fuel is dispensed through the managed pump or controller. The quantity dispensed becomes a transaction record rather than remaining only as a mechanical pump total.

04

Measure stock independently

TankWatch measures the physical tank level. This gives the operator a second information source for stock, deliveries and movements alongside the pump transaction record.

05

Review & report

The reporting layer brings field data into a browser-accessible management view so authorised users can review activity without standing at the pump.

Planning a similar project

What should be defined before specification.

The case-study equipment should not be copied blindly. A new installation needs to be sized and configured around the actual operation. These are the main questions We need to understand before choosing the appropriate hardware and software.

01

Fuel & storage

Which products are stored? What is the expected daily usage, peak usage, delivery frequency and reserve requirement? These answers influence tank capacity and whether multiple compartments are appropriate.

02

Vehicles & dispensing

Vehicle type, fill-point position, desired flow rate, hose reach and simultaneous fuelling demand determine the practical pump, hose and nozzle arrangement.

03

Access & accountability

Define whether authorisation should be tied to a driver, vehicle, department, contractor or another operational identity, and what information needs to be captured with each transaction.

04

Tank visibility

Decide what the site needs to know about physical stock: current level, ullage, deliveries, movement, alarms and how that information should be reconciled with pump transactions.

05

Reporting & users

Identify who needs reports, whether the organisation is single-site or multi-site, which managers need local or central access and what exceptions should be easy to investigate.

06

Installation & handover

Existing equipment, electrical and data connections, vehicle movements, groundwork, commissioning windows, staff training and any fixed go-live date all affect the delivery plan.

Apply the learning

What to take into your own project.

For a dispersed estate, assess existing pump compatibility and the communications path at each fuel point. Define how transactions and tank readings will be reviewed together before deciding which equipment genuinely needs replacement.

Read the project outcome →

Case-study FAQ

Project detail and specification questions.

These answers separate the recorded facts of this case study from the decisions that would need to be made for a new installation.

What was the main issue this agriculture & estates project needed to solve?

Improve communication and visibility across a dispersed estate. The previous system suffered reporting and communication failures. Remote locations made it difficult to reconcile pump throughput with tank information.

Which Fueltek systems are connected with this case study?

This project brought together FT4000, TankWatch and FMO software. Each system has a distinct role in fuel control, storage, monitoring or reporting.

Why use both pump records and tank monitoring where both are installed?

They measure different parts of the operation. Managed dispensing records the authorised transaction at the pump, while tank monitoring measures physical stock and movements in storage. Reviewing both gives the operator more context than either source on its own.

Would a new project use exactly the same specification?

Not automatically. A similar project should be specified around fuel type, storage capacity, peak dispensing demand, hose reach, user and vehicle access, communications, reporting requirements, installation constraints and any existing equipment that is suitable to retain.

What should be defined before a site survey or quotation?

Useful starting information includes the products to be stored, approximate daily and peak usage, current tank and pump details, vehicle types, required flow rate, number of users or vehicles, preferred access method, reporting expectations, communications available at the site and any installation or handover deadline.

Project outcome

What changed.

The estate gained a more consistent management layer across several fuel points while retaining appropriate existing dispensing equipment.

Relevant Fueltek systems

Explore the technology used.

Equipment is specified around the site, fuels, users, reporting requirements and existing infrastructure. The links below show the closest current Fueltek product areas connected with this project.

Plan your own system

Have a similar operational challenge?

Fueltek can review your tanks, pumps, vehicles, users, reporting requirements and existing equipment before recommending the most practical route forward.

Email salessales@fueltek.co.uk WhatsApp our Sales TeamWe’re just a click away